• a Dual Road from Sohar Gate to Al Barimi Road Interchange

     

  • Project Number:

    1131

     

  • Project Country:

     Oman

     

  • Client Name:

     Sohar Municipality

     

  • Narrative Description of the Project:

    The proposed dual road includes 30 km long main road and six other link roads about 30 km long. Hence the total length of the project is around 60 km. It will pass between the existing Batinah Highway and the proposed Batinah Expressway. The project road is classified as a major secondary road to serve the inland development of Sohar City and hence improves the traffic distribution and mobility in this region. The project road pasess through four major districts as defined by the master plan called Airport district, Sohar City Centre, Royal district and Southern Sohar. 98% of proposed residential areas will be allocated within these four districts. The project includes an interchange. Two of the at-grade roundabouts are designed to be upgraded to flyovers at a later stage.

     

  • Description:

    1) Detailed Topographic Survey
    2) Traffic Study
    3) Perform a hydrology study and hydraulic design to determine the drainage structures
    4) Study alternative alignment in the hilly area through aerial photographs and mapping
    5) Prepare preliminary design and tender documents
    6) Coordination with concerned authorities to obtain their approval of the design
    7) Prepare the final design and tender documents


     

  • Project Sector:

    Roads & Bridge

     

  • Services:

    Preliminary Design
    Final Design-Design Review

     

  • Project Start Date:

    27-Sep-11

     

  • Project Status:

    On going

     

  •  

Project Country
Project Sector
SERVICES
Project Status